Wattnode Power Panel Metering Device Chosen by CUIT
Written on June 23, 2009 – 8:36 am | by rh311
The first Wattnode was installed in Power Panel 2 and connected to a Babel Buster SPX for conversion of MODBUS to SNMP. This device will be tested and installed in all power panels in our Data Center.
Installation will be organized in 4 stages:
- 7 panels on north wall
- 10 panels on east wall
- 3 panels in mechanical room
- 2 panels in 103 philosophy