Wattnode Power Panel Metering Device Chosen by CUIT


Written on June 23, 2009 – 8:36 am | by rh311

wattnodeThe first Wattnode was installed in Power Panel 2 and connected to a Babel Buster SPX for conversion of MODBUS to SNMP. This device will be tested and installed  in all power panels in our Data Center.

Installation will be organized in 4 stages:

  1. 7 panels on north wall
  2. 10 panels on east wall
  3. 3 panels in mechanical room
  4. 2 panels in 103 philosophy